Managing the Terminal Float bar

Terminal float is a term widely used to describe the float between planned Completion and Completion Date under NEC (not an NEC term though). In this brief, I will discuss the ways of managing terminal float representation within the schedule in different scenarios.

Sign up to read this post
Join Now
Previous
Previous

Earned Value Performance Under NEC

Next
Next

The Chaos of Baselines - NEC & Performance Aligned Framework