Importing MSP Schedules in to P6
So you mainly use Primavera P6 as the scheduling software, but then sometimes you get schedules in Microsoft Project and it needs to be imported in to P6 for a more streamlined utilisation and integration with the rest of the project schedules. The importing process has to be done in a controlled manner to maintain traceability, so here is the process,
Sign up to read this post
Join Now